Validation of the Dynamic Wake Meander Model with AREVA M5000 Load Measurements at alpha ventus, February 2013, EWEA 2013
About
The Dynamic Wake Meandering (DWM) model was developed for wake load simulations in on- and offshore wind farms. The present paper outlines the DWM model and describes its validation with two years of load measurement data obtained from an AREVA M5000-116 turbine in the alpha ventus wind farm.
Download