Testing of Residential and Commercial End-Use Equipment for Compatibility with Hydrogen Blended Gas

Joint Industry Project

This joint industry project is to determine the effect of hydrogen blending on the safety and reliability of end use equipment installed in North America.

The injection of low carbon hydrogen into existing gas infrastructure is one of the most attractive alternatives for reducing carbon outputs while the industry works on decarbonizing domestic and commercial end-use equipment. In order to ensure the safety and reliability of residential and commercial end use equipment, DNV performs laboratory testing of appliances using hydrogen blended gas.

Challenge

20231002 Hydrogen blended gas 2 175x200p

It is well known that the combustion properties of hydrogen differ substantially from those of natural gas. This can result in the changing performance of end-use equipment when hydrogen is blended into natural gas, including burner overheating, flashback, and engine knock. To ensure the safe and reliable performance of residential and commercial appliances connected to the gas network, it is important to determine the maximum allowable hydrogen percentage in natural gas.

20231002 Hydrogen blended gas 1 130x200p

The natural gas utilization equipment installed in the field is diverse, for example gas engines, and residential and commercial burner systems of different purpose, design, adjustment, and maintenance history are installed across the distribution areas in North America. Analysis performed by DNV and others shows that the different types of combustion equipment can have significantly different sensitivity to hydrogen.


Objective

The primary objective of the JIP is to.....

Approach

To address the current knowledge gaps, DNV has completed multiple projects to experimentally determine the effect of hydrogen blending on the safety and reliability of end use equipment installed in North America.

Benefits

By participating in the JIP, members can expect the following benefits:


Project partners

.....

Project details

The project starts in ..... and is anticipated to conclude current scope in ..... The scope of our project includes:

  • .